Hoping to paint our frontage black, with a big logo at the end. We'll see if the city goes for it!
Friday, 10 June 2011
June 8
June 7
In the end all agreed that the bottom right section of the wall, with horizontal trim running through the intersections, tied off with a nice vertical line, was the way to go.
June 2 Rudy's!
June 2
Put strips up along bocce fire wall, ready for sheetrock and then panelling.
Started laying the floorboards on top of their moisture barrier whilst others were knocking out the crossbeams to go between the columns.
Began the adventure of designing the detailing for the mahogany panelling, and it's trim. This will eventually cover 75% of the walls.
Got the crossbeams over the backbar in place, the backbar itself will be made out of copper, very excited to see how it will turn out!
Subscribe to: